Explore locations
The Dawson Lagoon working group has been working hard to find the most workable location for the Dawson sewage lagoon.
Location is key
There is no perfect location available, so we need to carefully balance priorities when selecting a site. We consider the following:
- proximity to town, as the water has to be piped to the lagoon;
- elevation between the lagoon and the town, since pumping water uphill requires more energy and increases costs;
- safety from geohazards like flooding, landslides and melting permafrost;
- availability of a large area of land for the lagoon to function properly;
- adherence to the town’s official community plan and zoning bylaw, which dictates how land can be used;
- adequate land quality to support the lagoon’s structure; and
- avoidance of notable heritage lands.
Explore using our mapping tool
In the application below, you can learn more about how the working group is balancing priorities. Click through the map layers on the bottom right-hand side to explore different considerations. You can show and hide the "legend and layers" selector to see more of the map.
- The heritage information layer shows notable heritage locations.
- The Callison sites layer shows the areas we’re investigating.
- The mining claims layer shows registered mining claims.
- The land availability layer shows where land is unavailable due to it being privately owned or for other reasons.
- The geohazard risk levels layer shows where flooding, landslides and permafrost are more likely to occur.
- The operations and maintenance costs layer shows the areas where it's more expensive to run the facility based on pumping water uphill or over long distances.
- The slope grade shows how steep the area is. It is difficult and expensive to build on a steep slope.