The Carmacks Copper project is a mine located 198 kilometres north of Whitehorse on the Traditional Territory of the Little Salmon/Carmacks and Selkirk First Nations.
The mine is expected to be a low-cost producer of cathode copper. The operation employs solvent extraction and electro-winning techniques to recover oxide copper.
For information on the status of the site or to access licensing documents, email the Mineral Resources Branch at [email protected].
The following documents are only available in English. We’ll update this page as we create and modify licensing documents.
Documents we're reviewing
Reclamation and closure plan (November 2022; 22,708 KB)
Quartz mining licences
- Quartz mining licence QML‒0007 (April 2009; 1,913.96 KB)
- Authorization of assignment of quartz mining licence QML‒0007 (January 2012; 20.36 KB)
Correspondence
There are no documents at this time.
Development and operational plans
Surface mining plans
- Approval of general site plan (May 2009; 434.38 KB)
- General site plan: stage 1 construction site plan (October 2008; 21,091.89 KB)
- General site plan – appendix D (June 2008; 8,551.93 KB)
Underground mining plans
There are no documents at this time.
Processing facilities plans
There are no documents at this time.
Mine waste management plans
There are no documents at this time.
Health and safety plans
There are no documents at this time.
Environmental and socio-economic plans
There are no documents at this time.
Reclamation and closure plans
- Preliminary detailed closure and reclamation plan (May 2009; 4,388.83 KB)
- Approval of the reclamation and closure plan (May 2009; 761.72 KB)
Financial security
There are no documents at this time.
Correspondence
There are no documents at this time.
Reporting and inspections
Annual reporting
- 2009 annual report (March 2010; 24,892.38 KB)
- 2010 annual report (March 2011; 4,358.19 KB)
- 2011 annual report (March 2012; 24,567.30 KB)
- 2012 annual report (March 2013; 9,970.37 KB)
- 2013 annual report (March 2014; 6,278.27 KB)
- 2014 annual report (March 2015; 7,085.69 KB)
- 2015 annual report (March 2016; 17,856.96 KB)
- 2016 annual report (March 2017; 6,781.99 KB)
- 2017 annual report (March 2018; 3,881.37 KB)
- 2018 annual report (March 2019; 10,867.06 KB)
- 2019 annual report (March 2020; 8,341.56 KB)
- 2020 annual report (June 2021: 1034.87 KB)
- 2021 annual report (April 2022: 3,157 KB)
- 2022 annual report (March 2023: 7,342 KB)
- 2023 annual report (April 2024; 16,622 KB)
Physical reporting
- 2010 annual physical inspection report (July 2010; 1,738.08 KB)
- 2011 annual physical inspection report (July 2011; 7,175.43 KB)
- 2012 annual physical inspection report (July 2012; 3,986.35 KB)
- 2013 annual physical inspection report (July 2013; 9,607.19 KB)
- 2014 annual physical inspection report (August 2014; 2,341.08 KB)
- 2015 annual physical inspection report (November 2015; 5,819.30 KB)
- 2016 annual physical inspection report (November 2016; 7,335.65 KB)
- 2017 annual physical inspection report (November 2017; 4,043.92 KB)
- 2018 annual physical inspection report (October 2018; 5,128.28 KB)
- 2019 annual physical inspection report (October 2019; 6,920.30 KB)
- 2021 annual physical inspection report (October 2021; 9,838 KB)
- 2022 annual physical inspection report (October 2022; 9,124 KB)
- 2023 annual physical inspection report (December 2023; 10,057 KB)
Mine development reporting
There are no documents at this time.
Environmental reporting
There are no documents at this time.
Socio-economic reporting
There are no documents at this time.